Products · DMS · Church care, DAC & faculties

Every church. Every cycle.
Evidenced.

The quinquennial written in the system rather than filed as a PDF. The committee’s agenda and minutes generated from its own casework. Seven inspection cycles tracked per church. And the heritage constraints that shape every decision, pulled from the national registers automatically.

13
Standard elements per inspection
Offline
Survey app, inside the building
7
Inspection cycles per church
Auto
Heritage constraints synced
What changes for a DAC

Three things a DAC secretary stops assembling.

The casework, the cycles and the constraints — in one record per church, instead of three filing systems and a map on the wall.

The committee’s papers, generated.

The agenda and the minutes are produced from the casework itself — standing items, cases by type with officer initials, the List B items to note, and the delegated-authority table. Both download as PDFs named for the meeting. The faculty process →

Every cycle, not just QI.

Quinquennial, electrical (EICR), lightning protection, fire risk, asbestos, tree survey and heating — each on its own cycle with due-date tracking, reminders and export.

Constraints, automatically.

Listed-building status from Historic England’s NHLE, conservation areas, scheduled monuments, TPO zones and heritage-at-risk — shown on every church and every DAC case without anyone looking them up.

The quinquennial itself

Written in the system, not uploaded to it.

A quinquennial report is normally a PDF: produced in Word, emailed round, filed, and never read again until the next one. The inspection is the single richest source of information a diocese has about its buildings, and it arrives in the least usable form imaginable.

A survey app for the architect

Installs on a phone, works with no signal inside the building, syncs when it has one again. Thirteen standard elements, defects against each, urgency, the permission each would need, costs, and geo-tagged photographs.

Started from the church record

One action opens the inspection against the building — carrying over its listing grade, list entry and grid reference, numbering the quinquennium, and laying out the standard elements so nothing is missed.

The report, produced

Cover page, description, limitations, work since the last inspection, condition element by element, recommendations, and the costed schedule grouped by urgency. On screen, printable, downloadable as a PDF.

Issue and distribute, evidenced

The report must reach the parish, the archdeacon and the diocese within three months. Each recipient is recorded as its own row, so the duty is evidenced one by one rather than asserted — and the inspection is then closed to further editing.

Inspections due, month by month

Every church’s next quinquennial by the month it falls due, over one to five years. Quinquennials arrive in clusters, so this is the view that says when to start commissioning architects — not just who is already late.

Condition flows outwards

Saving an inspection updates the church, the condition map and the fabric survey. The estate view and the building view are the same data, so they cannot drift apart.

In the detail

From the QI PDF to the churchyard map.

The paperwork becomes data, and the data becomes reminders — before the architect’s recommendations go quietly out of date.

QI register with reminders

QI cycles per church with due dates, chasing and export — the whole diocese’s inspection position on one screen. Tracking QI cycles →

QI report parsing

Upload the architect’s QI PDF and the repair recommendations are extracted straight into trackable tasks — not filed and forgotten.

Plots, footprints & UPRNs

HM Land Registry INSPIRE polygons and OpenStreetMap footprints mapped per church, with UPRNs — you know exactly what land each case concerns.

Assets & churchyards

Church assets, churchyard capacity, contractors and ecological constraints recorded against the building they belong to.

Certificates from the parish

Wardens and fabric officers upload inspection certificates through the Parish Portal’s Church Care area — straight into the DAC’s records.

The DAC dashboard

QI summaries and live casework tables for the committee cycle — agenda-ready, not assembled the night before.

A photograph of every building

Openly licensed photographs matched to each church, with the photographer and licence shown — and the diocese can add its own, including before-and-after pairs of a repair.

The site-visit sheet

One page to take on a visit: photograph, constraints, statutory checks, outstanding work, who to speak to, last contact, and a box for notes. Printed before leaving the office.

Deprivation, as a filter

Every church carries the deprivation of the parish it serves, so “overdue inspections in the parishes least able to pay for the work” is one click — on the churches list, the fabric survey, the condition map and the inspections calendar.

Street View and the registers

Street View, aerial view, the Historic England list entry and A Church Near You open straight from the church record. No keys, no cost.

The national portal, referenced

The faculty petition stays in the national portal; its reference and status sit on the case here. We link to it rather than keeping a second copy to argue with. Why →

The committee itself

DAC membership with roles and expertise, and a composition check against the statutory schedule — so the question “are we properly constituted?” has an answer on screen.

The quinquennial cycle as a cycle

Inspectors, appointments, recommendations graded by urgency and report distribution — the round managed as a rolling programme rather than a folder of PDFs. Statutory compliance →

Closures, recorded properly

Closed churches and closed churchyards held as the distinct legal states they are, with the maintenance liability that follows each one.

Heritage at Risk, tracked

The Historic England register matched to your churches by list entry number, with priority category and year of entry — and vulnerable churches summarised separately from those formally on the register.

Consultations & notices

Statutory consultations, website notices and List B decisions recorded against the case they belong to, so the procedural trail survives the officer who ran it.

Before / after

The QI round, then and now.

A composite scenario rather than one named diocese — how the inspection cycle typically changes shape.

Before
  • The QI spreadsheet lives with one officer; the fire risk one with another.
  • Architects’ reports filed as PDFs; the recommendations inside them never resurface.
  • Listed status checked on the Historic England website, case by case.
  • The DAC agenda assembled by email the week before the meeting; the minutes typed up a fortnight after it.
  • Nobody can say which inspections fall due next year, so architects are commissioned late.
After
  • Seven cycles per church, one register, reminders before anything lapses.
  • The inspection written in the system — every recommendation already a task with an urgency and a cost.
  • Heritage constraints on the case record before you open it.
  • The agenda and the minutes generated from the casework, as PDFs.
  • Inspections due by month, so commissioning starts a year ahead.
A quinquennial report that nobody re-reads is just an expensive way to feel inspected.
— Read more: Tracking QI cycles · Managing the faculty and DAC process
Next step

Bring your QI
spreadsheet.